We was called out to STOP the rising damp to this Victorian hotel in one of the bridal rooms. After removing the damp plaster and installing a DRY ZONE damp roof course then replacing plaster with limelight renovating plaster and tanking using membranes to stop penetrating damp. We got this project to the stage of first fix joinery its always a pleasure to work on properties with a long history.